Projects Overseen - $25-30 Million in improvements

 

Paving 

  • Taxiways/Taxi lanes in concrete and asphalt overlay

  • Ramps in concrete and asphalt and asphalt overlays

  • Runways – asphalt overlays

  • Access roadways – asphalt overlays

Building renovations – terminal building      

  • Rehab restrooms

  • Additional restroom

  • Added airlocks to doors

  • Remodeled security screening area

  • Created TSA spaces

  • Replaced airline & rental car counter areas

  • Replaced baggage carousel and conveyors

  • Replaced HVAC system, ceilings, and light fixtures

  • Brought terminal into ADA compliance

  • Installed life safety systems

  • Rehab kitchen & snack bar

  • Replaced Terminal Roof

Replacement and Repair of several buildings' roofs

Landslide repair

Storm water drainage improvements

Fuel farm replacement (included remediation of old tank farm)

Site preparation

  • Army Aviation Support Facility

Building construction

  • General Aviation Terminal

  • CFR Station

  • 2 T-Hangar buildings

Runway Safety Area – Phase 4 (phase 2 of construction) was underway at retirement

 

Equipment purchases

  • ARFF Truck

  • Snow blower

  • Snow sweeper

  • End loader

  • MPT Truck with blade

  • Fuel Truck

  • Deicing Truck

  • Vacuum Truck

  • Bidirectional Tractor w/broom, end loader, broom, mower, & fork

  • Medium Duty Truck

  • 4 Pick-up Trucks (most with blades)

  • 4 Cars

  • Generator – back-up power for Terminal Building

2 Master Plan Updates

 

Also participated in numerous statewide planning studies:

  • E/A selection panels

  • Technical Advisory Groups

Carolyn E. Strock, A.A.E., MBA

C. E. Strock Consulting

521 Market Street #5, Parkersburg, WV 26101

Phone: (304) 424-3457 Ext 138           Fax: (304) 422-1025 #5

cs@cestrock.com

Certified Disadvantaged Business Enterprise (DBE)