Projects Overseen - $25-30 Million in
improvements
Paving
-
Taxiways/Taxi
lanes in concrete and asphalt overlay
-
Ramps in concrete
and asphalt and asphalt overlays
-
Runways – asphalt overlays
-
Access roadways – asphalt
overlays
Building renovations – terminal building
-
Rehab restrooms
-
Additional restroom
-
Added airlocks to doors
-
Remodeled security screening
area
-
Created TSA spaces
-
Replaced airline & rental car
counter areas
-
Replaced baggage carousel and
conveyors
-
Replaced HVAC system, ceilings,
and light fixtures
-
Brought terminal into ADA
compliance
-
Installed life safety systems
-
Rehab kitchen & snack bar
-
Replaced Terminal Roof
Replacement and Repair of several buildings'
roofs
Landslide repair
Storm water drainage improvements
Fuel farm replacement (included
remediation of old tank farm)
Site preparation
Building construction
Runway Safety Area – Phase 4 (phase 2 of
construction) was underway at retirement
Equipment purchases
-
ARFF Truck
-
Snow blower
-
Snow sweeper
-
End loader
-
MPT Truck with blade
-
Fuel Truck
-
Deicing Truck
-
Vacuum Truck
-
Bidirectional Tractor w/broom,
end loader, broom, mower, & fork
-
Medium Duty Truck
-
4 Pick-up Trucks (most with
blades)
-
4 Cars
-
Generator – back-up power for
Terminal Building
2 Master Plan Updates
Also participated in numerous statewide
planning studies:
|